![]() |
Ningbo Huaping Metalwork Co., Ltd.
|
Payment Terms: | T/T |
Place of Origin: | Zhejiang, China (Mainland) |
![]() |
|
Add to My Favorites | |
HiSupplier Escrow |
product name Quarter-Turn Boiler Drain Valve
• feature
• 1.Meet NSF approved low lead standards
• 2.Easy Quarter Turn Operation
• 3.Maximun 125PSI working pressure
• 4.Chrome Plated Brass Ball
• 5.Teflon Seats
• 6.3/4" Hose Thread Outlet
• 7.Pipe Thread Comply with ANSI B1.20.1
• 8.Hose Thread Comply with ANSI B1.20.7
• 9.Solder Ends Comply with ANSI B16.18
• Material List
Item | Part | Material |
1 | Body | Brass |
2 | End Cap | Brass |
3 | Ball Seat | PTFE |
4 | Ball | Brass |
5 | Stem | Brass |
6 | O-ring | NBR |
7 | Bolt | Nickle Plating steel |
8 | Handle | Aluminum |
9 | Nameplate | Aluminum |
Dimension
Description | Dimension | |||
Boiler Drain FIP to hose | Size | A | B | C |
1/2' | 2.157 | 1.134 | 1.307 | |
3/4' | 2.217 | 1.134 | 1.307 |
• Features
• 1. High quality.
• 2. Compact and optimized structure.
• 3. Good price with professional service.
• 4. Full type of items.
• 5. Customized service.
• 6. Prompt delivery time.
Material Control
• Sampling inspection is performed towards each batch of material,using ARL spectrum analyzer.
Machining Quality Control
• Self-check in machining process includes 1st article inspection and in-process inspetion(record the data of product every hour).
• Quality inspector performs several time?stour inspection and record the result as well.
In-coming Materials Inspection
• All components made in-house or outsourced are inspected before coming into components warehouse.
Assembly Line Quality Control
• The first batch of selected products are assembled and inspected by assembly worker and record is available.
• Tour inspector performs several times check at the assembly line and record the data.
• Worker performs visual check at the appearance of products.
Leakage Testing
• All casting parts and assembly products are under 100% leakage test.
Final Inspection before Delivery
• Inspector performs sampling check from the packaged products, and qualified products are allowed for delivery from finished products warehouse.